Skip to content
Home

Client: A packaging manufacturer in Jeddah (confidential)

Manufacturing Workforce Solution

Key Takeaways

  • A managed workforce arrangement with an embedded on-site supervisor, not just supplied headcount.
  • A standby replacement pool equal to 10% of line headcount kept the production line from ever stalling on a resignation.
  • 90-day turnover fell by more than half, and unplanned line stoppages from understaffing dropped to zero.
Manufacturing Workforce Solution

The Result

55%

Reduction in 90-day turnover

60+

Production-line workers supplied

0

Unplanned line stoppages from understaffing

Manufacturing Workforce Solution

The Challenge

A packaging manufacturer running two shifts had chronic turnover on its production line, with new hires rarely staying past the first three months — recruitment costs were eating into margins faster than production could recover.

The Solution

We supplied semi-skilled production-line workers under a managed workforce arrangement, with our own supervisor embedded on-site to handle scheduling, performance and early-stage attrition directly.

Deployment

A replacement pool equal to 10% of line headcount was kept on standby so a resignation never stalled the production line, and every new worker went through a structured two-day line-specific orientation before their first shift.

The Result

Line turnover in the first 90 days dropped by more than half within the first year of the arrangement, and the client stopped experiencing unplanned line stoppages due to understaffing.

Construction Project Workforce

Client: A Riyadh-based general contractor (confidential)

180+ Skilled workers mobilized · 6 weeks To full trade coverage · 0 Labor-related schedule delays

Facility Management Workforce Deployment

Client: A commercial property management firm in Riyadh (confidential)

3 Functions consolidated under one contract · 8+ Commercial towers covered · 6 weeks Full transition timeline

Large-Scale Workforce Mobilization

Client: An industrial contractor in Jubail (confidential)

320+ Workers mobilized · 4 weeks Full mobilization window · 3 Source regions coordinated

Ready to Mobilise Your Workforce?

Tell us the roles, the city and the timeline — we'll respond within one business day.

Chat on WhatsApp